Construction of a stormwater drainage system including a lined stormwater storage pond. Construction of a lift station including all required appurtenances.
Installation of Major Underground and Earthworks servicing for several Multi Family Developments in the capital region amounting to over 700 units services.
Land development which includes the construction of 154 single family residential lots (Phase 1), commercial sites, multifamily sites and stormwater management.
Supply and installation of approximately 4,000m of storm sewer, 2,300m of sanitary sewer and 2,500m of watermain distribution piping.
Supply and installation of approximately 18.4km of (450mm/600mm) HDPE DR 11 transmission main by both open cut and HDD methods.