The scope of work consisted of the supply and installation of 850m of 200m sewer force main from the sanitary lift station, building a new facultative and storage lagoon system, including associated HDPE liner. Supply and installation of control manholes, structures, tie into existing systems and other related works on site. Offsite there is approximately 800m of drainage channel for the lagoon system outfall; includes ESC measures and fencing.