Cargill

Cargill Camrose Fertilizer Hub

Construction of a stormwater drainage system including a lined stormwater storage pond. Construction of a lift station including all required appurtenances.

Completed

April, 2021

Location

Camrose

Client

Placeholder Text

Project Details

The scope consisted of the excavation and stockpiling of sorted materials.  Construction of a stormwater drainage system including a lined stormwater storage pond.  Construction of a lift station including all required appurtenances.  Grading of site for stormwater conveyance including culverts, rip rap, silt fencing and erosion blankets.  Detailed excavation of a building envelope for a foundation structure and placement of aggregate for road and building structures.  Preparation of foundation, subgrade and sub-ballasts for rail bed.

Image Gallery

Testimonials

"Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vivamus semper massa quis hendrerit ornare. Integer molestie lorem id pretium maximus. Quisque a maximus metus. Mauris et sem nisi. Aliquam in pellentesque felis. Ut a mollis ligula, ornare faucibus lectus. In vitae magna non neque faucibus suscipit "

"met, consecsemper massa quis hendrerit ornare. Integer molestie lorem id pretium maxifelis. Ut a mollis ligula, ornare faucibus lectus. In vitae magna non neque faucibus suscipit "

Get in touch

Bring your project to life by partnering with us today.

Contact us