{"id":668,"date":"2026-07-09T12:27:35","date_gmt":"2026-07-09T18:27:35","guid":{"rendered":"https:\/\/nuedge.digitaltea.com\/?post_type=project&#038;p=668"},"modified":"2026-08-24T12:11:22","modified_gmt":"2026-08-24T18:11:22","slug":"668","status":"publish","type":"project","link":"https:\/\/nuedge.digitaltea.com\/?project=668","title":{"rendered":"Cargill Camrose Fertilizer Hub"},"content":{"rendered":"<p>The scope consisted of the excavation and stockpiling of sorted materials.\u00a0 Construction of a stormwater drainage system including a lined stormwater storage pond.\u00a0 Construction of a lift station including all required appurtenances.\u00a0 Grading of site for stormwater conveyance including culverts, rip rap, silt fencing and erosion blankets.\u00a0 Detailed excavation of a building envelope for a foundation structure and placement of aggregate for road and building structures.\u00a0 Preparation of foundation, subgrade and sub-ballasts for rail bed.<\/p>\n","protected":false},"featured_media":1368,"template":"","meta":{"_acf_changed":false},"class_list":["post-668","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/nuedge.digitaltea.com\/index.php?rest_route=\/wp\/v2\/project\/668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuedge.digitaltea.com\/index.php?rest_route=\/wp\/v2\/project"}],"about":[{"href":"https:\/\/nuedge.digitaltea.com\/index.php?rest_route=\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuedge.digitaltea.com\/index.php?rest_route=\/wp\/v2\/media\/1368"}],"wp:attachment":[{"href":"https:\/\/nuedge.digitaltea.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}